Minor progress in the last few days. The tool I made for the bonnet pin removal wasn't strong enough and bent. A small modification next week may yield results but in the meantime the pins are getting sprayed with PlusGas (or Halfrauds equivalent) to loosen them. Perhaps.
Disassembly continues with a few more minor pieces removed and bagged. So far a few have been cleaned/polished and put away for the rebuild but this week saw the first part overhauled properly. The nearside driveshaft has been removed, disassembled, shaft cleaned, degreased and painted. The inner CV joint broken into it's 9 component parts, examined and appears healthy so it's been reassembled ready for grease. The outer CV joint was showing signs of wear and play but a good replacement has been dug out of 30 years of Stratos spares and assembled onto the shaft with a new boot and tie straps. I've placed my first order with Mark which includes a pair of inner boots and when they arrive that shaft will be boxed up and put away until it's needed again. Next week should see the same process with the other shaft. They'll go back on the side that they came off, I'll be able to tell by the direction I've put the straps on, exposed end trailing the direction of rotation.
The cover for the fuel pipes in the boot was also stripped of paint and rust, the surface treated with rust converter, primed and top coated again. Hopefully we'll get some nice days next week so spend a few hours tinkering!
Guy