Nearside done now bar filling in the aerial hole! The rear suspension turret and box sections are as good as new, the outer inner arch has been cut out and the corrosion underneath removed and all rebuild with repairs to the lip of the arch as necessary. The sill on that side is back to full strength and the floorpan corrosion dealt with, jacking point straightened and the two lift points cut out, strengthen and reinstated. A small dent in the sill has also been fixed. Work has started on the offside rear arch and turret. Now Geoff knows the issues I'm hoping the repairs will be easier for him. Once that's done it's the sill on that side, stitch in the new rear panel and flip it back over so the roof can be worked on. And that will be the shell done. Minor bonnet repairs plus doors and botlid and it'll be ready to be dipped again ready for .... paint!
So I thought I'd better get on with some bits... The steering rack is now done except for the new bracket for the shock absorber and oil. That ought to be finished in the next couple of weeks once the bracket is welded, plated and painted.
The fuel tank has been in the garden shed since last Summer. It was drained of 20 litres of stale fuel and force vented for 30 minutes by attaching the filler pipe to the exhaust of the Alfa 159. Nothing left in there. So, dragged it out of the shed to assess what it needs. The bottom of the tank was covered in underseal and rust proofing spray. It had suffered a bit over the years and failed where it had been scraped so needed looking at. It started looking like this...