I've starting chopping up the longer sealed rear strut so I can fit a cartridge like the shorter one.....a pair of kybs are on order,to in the mean time I took a random water connection elbow a had knocking about

Cut it up for the threaded sections

One end now screws into the other

Ready to weld on to the old sealed strut,now with the damper internals removed....i just need the new inserts to get here to determine the length

Remember these rather weedy 4 c section lower suspension arms?

As you can see in the pic,one was bent and all the bushes were knackered. So I took all these little bits I acquired

And welded them together to get 4 adjustable arms for adjustable camber and toe.


Dismantled the rear hubs/brakes for cleaning overhaul and painting too


And de-rusted,painted and stone chipped the fuel tank too

The rear suspension and brakes are nearly all cleaned and painted now,with new bushes,ready for re-fitting after the waxoil fest and tank re-fitting. Just waiting for new pads and the shock inserts.