So plan for this weekend now that the Espace is fixed and not keeping me away from more important Beta work, is:
Providing the upper spring cups are ready then the back end suspension will get rebuilt and hubs/brakes etc being re-fitted.
Replace engine oil
Replace gearbox oil
Replace oil & air filters
Replace alternator belt
Replace spark plugs (if needed - not sure if Mark did this already)
Replace water hoses and clamps from heater matrix to engine
Replace rubber fuel pipes and clamps in engine bay
Before I bought the car from Mark some parts were renewed, like dizzy cap, rotor, points, coil etc, so I'm good on that front.
I think I have changed my mind over when to replace the rubber brake pipes, this may well be done this weekend so the brakes will get bled through as well. Some of this depends on whether the spring cups are ready.
The cam belt and tensioner bearing will be replaced when I get back from the US in mid-June as I have to ask Tony H if I can borrow the cam locking tool.

I'll be ordering a set of black, front ARB and wishbone bushes soon, but I have to strip the front suspension, brakes, hubs and wishbones. Once the big bits are off they have to be blasted and repainted then refitted. Lots of new parts going on like lower ball joints, bearings and track rod ends.
I have a large box of parts that is my latest batch to be blasted & some of it will be plated. Ideally this will be done while I am away and ready for me when I get back. (I'll be eager to do some work on the car as I'd have been away for 3 weekends)
Seems like a lot of work but I think it should all be fairly straight forward methinks. (Crosses fingers

)
And after all thats done it will be time to strip the car fully in preparation for the car for going off to be welded and painted. (By the same guy that did my red S2/FL)